In both CFA Level I and Level II exams, Capital Budgeting is a mandatory core topic. Candidates must not only master Net Present Value (NPV) and Internal Rate of Return (IRR), but also have a deep understanding of the Payback Period (PB) and Discounted Payback Period (DPB) — their concepts, calculation methods, and limitations. Although these two metrics are relatively simple to compute, they frequently appear as distractors in exam questions or are combined with NPV to test candidates' depth of understanding of the Time Value of Money.
Payback Period (PB) is the time required for a project's cumulative cash flows to equal its initial investment cost. It focuses on the speed of capital recovery, reflecting the project's liquidity and risk. However, PB's greatest flaw is that it ignores the time value of money and also ignores all cash flows after the payback period.
Discounted Payback Period (DPB) is an improvement over PB. It discounts future cash flows to present value using a given discount rate (Hurdle Rate), then determines when the cumulative present value covers the initial investment. DPB accounts for the time value of money, making it more accurate than PB for evaluating long-term projects. However, DPB still retains another flaw of PB: it ignores cash flows after the payback period.
In the CFA exam, understanding the difference between the two is crucial. When a question asks "which metric ignores the time value of money," PB is the standard answer; when a question requires assessing project risk while considering the cost of capital, DPB is the better choice.
Suppose a company is considering a project with an initial investment of 1 million yuan, and expected cash flows over the next 4 years are 300,000, 400,000, 500,000, and 600,000 yuan, respectively. The company's cost of capital (discount rate) is 10%. Calculate the project's PB and DPB.
First, calculate the cumulative nominal cash flows:
Cash flow turns positive in Year 3, indicating the payback period is between 2 and 3 years.
PB = 2 + (30 / 50) = 2.6 years.
We need to calculate the discounted cash flow for each year, then find the cumulative values.
BA II Plus keystrokes:
Since the BA II Plus does not have a direct PB/DPB function key, we need to manually calculate the present value for each year. The general formula for calculating present value on the calculator is $PV = FV / (1+r)^n$.
2ND + CLR TVM, then press 2ND + CLR WORK.30, press FV.10, press I/Y.1, press N.CPT + PV, display shows -27.27 (take positive value 27.27).40, press FV.2, press N.CPT + PV, display shows -33.06 (take positive value 33.06).50, press FV.3, press N.CPT + PV, display shows -37.57 (take positive value 37.57).60, press FV.4, press N.CPT + PV, display shows -40.98 (take positive value 40.98).Cumulative discounted cash flow calculation:
The cumulative value turns positive in Year 4, indicating the DPB is between 3 and 4 years.
Unrecovered amount = 2.10
Year 4 discounted cash flow = 40.98
DPB = 3 + (2.10 / 40.98) ≈ 3.05 years.
Exam tip: If you are studying on mobile, we recommend using RBA Calculator (TI BA II Plus iOS app), which perfectly simulates the physical key feel and helps you become familiar with the above procedures. Download link: https://apps.apple.com/cn/app/id1545331477
In the CFA exam, Payback Period and Discounted Payback Period rarely appear alone; they are usually part of a comprehensive question.
Candidates often make the following mistakes during preparation and should pay special attention to them:
2ND + BGN to check whether the screen displays END.Q1: When the Payback Period (PB) and Net Present Value (NPV) conflict, which should prevail?
A1: From a theoretical rigor standpoint, NPV is superior to PB. NPV considers all cash flows and the time value of money, directly measuring the increase in shareholder wealth. PB serves only as a supplementary metric for assessing liquidity and risk. If you encounter a conflict in the exam, a positive NPV is generally the final basis for accepting a project, unless the question explicitly imposes a strict payback period constraint.
Q2: Is the Discounted Payback Period (DPB) always greater than the Payback Period (PB)?
A2: Yes, as long as the discount rate is greater than 0%, future cash flows will be smaller after discounting, causing the cumulative cash flow to recover more slowly. Therefore, DPB is necessarily greater than or equal to PB. If the discount rate is 0%, they are equal.
Q3: How do the requirements for these two metrics differ between CFA Level I and Level II?
A3: CFA Level I focuses on calculation and basic conceptual distinctions, requiring candidates to quickly compute PB and DPB values. CFA Level II focuses more on applying these metrics in real-world cases, potentially incorporating project financing structures, inflation adjustments, and other factors to test more complex decision-making logic.
Q4: What does it mean if the calculated DPB exceeds the project's total life?
A4: This means that over the entire project life, the sum of discounted cash flows cannot cover the initial investment. In other words, the project's NPV is negative, making it financially infeasible and it should be rejected.
Mastering the Payback Period (PB) and Discounted Payback Period (DPB) is foundational to the CFA Capital Budgeting chapter. Although they are not as central as NPV and IRR, they are indispensable for assessing project risk, liquidity, and navigating specific exam traps. By proficiently using the BA II Plus for discounted cash flow calculations and understanding the time value logic behind both metrics, candidates can confidently handle related questions on the exam. We recommend using tools like RBA Calculator for high-frequency practice to ensure both speed and accuracy.
RBA Calculator handles all TVM, NPV/IRR and bond calculations, matching the BA II Plus used in exams 100%.
Free Download on App StoreDon't want to download?Try the web calculators →